Identifying barriers for removal to restore habitats and biodiversity in the Upper Mureș Basin, Romania

The project aims to identify and prioritise artificial barriers for removal in the upper Mureș River Basin to restore ecological connectivity, enhance biodiversity, and support sustainable river management.

Introduction

The upper Mureș River, flowing through the Eastern Carpathians from its source near Izvorul Mureșului to the town of Reghin, is one of Romania’s most ecologically valuable river stretches. Characterised by largely unaltered riverbeds and high habitat diversity, it supports rich aquatic and riparian biodiversity, including fish, amphibians, and semi-aquatic mammals.

Despite its natural value, ecological connectivity is severely hindered by numerous small dams and barriers, many of which are obsolete. The project area covers approximately 550 km of river and key tributaries and plays a crucial role in the overall health of the Mureș River Basin.

At a glance

Project statusCompleted
Project typeBarrier identification and prioritisation
CountryRomania
RiverMureș River
Focal speciesTrout (Salmo trutta fario), huchen (Hucho hucho), and grayling (Thymallus thymallus)
OrganisationRomanian Wilderness Society (RWS), in collaboration with Milvus Group
WebsiteRWS

Project context and opportunity

Although the upper Mureș River remains a biodiversity hotspot, decades of infrastructure development – particularly dams and weirs – have disrupted natural hydrological processes and fragmented aquatic habitats. These barriers limit fish migration, reduce water quality, and negatively affect the overall resilience of freshwater ecosystems. While the lower Mureș River has been the focus of recent restoration initiatives, the upper basin remains largely unassessed and lacks a structured approach to ecological reconnection.

This project presents a vital opportunity to extend river restoration efforts upstream, fill key data gaps, and contribute to basin-wide ecological coherence. It will also foster collaboration with local stakeholders and strengthen capacity around nature-based solutions in Romania, a country where dam removal is still an emerging practice.

Project aims

The primary goal of the project is to identify and prioritise artificial barriers in the upper Mureș River Basin for potential removal, to restore habitat connectivity and enhance biodiversity. The project’s team will conduct database analysis, extensive field surveys across 550 km of river and tributaries, and GIS-based mapping to evaluate each barrier’s ecological impact and feasibility for removal. Data will be integrated into national and European platforms such as the AMBER Barrier Atlas. Stakeholder engagement and expansion of the steering committee will support inclusive planning and regional buy-in.

Expected outcomes include a detailed inventory of barriers, a shortlist of those suitable for removal, and a foundation for future A2 (pre-demolition) and A4 (demolition) project applications. Ultimately, this work will complement efforts in the lower Mureș, establishing a basin-wide strategy to improve riverine ecosystems and climate resilience.

Project achievements

The project successfully mapped over 540 km of river network, significantly improving the data available for river restoration in Romania. Through rigorous field verification, the project confirmed the high ecological value of the basin, recording 16 fish and one lamprey species, including several protected indicators like the huchen.

A major milestone was the successful engagement of over 40 institutional stakeholders through roundtables and a concluding webinar with nearly 30 key representatives, which solidified support for future removals. By making the final barrier data and an interactive map publicly accessible on a dedicated website, the project has created a transparent and lasting resource for river management. Concerns that came up in the engagement meeting were addressed through a primary hydrological modelling for the Ciumani dam area. The first results show that the removal would cause no significant risk to the local water table or upstream wetland habitat.

The primary outcome is a prioritised list of barriers for removal, backed by a solid foundation for continued openness and inter-institutional collaboration with key entities such as the National Water Administration. This established framework has directly paved the way for two new applications to the Open Rivers Programme, ensuring a continuous, basin-wide effort to
restore one of Romania’s most ecologically significant rivers.

The project team received a follow-on pre-demolition grant to prepare the removal of Ciumani village barrier.

Partners