The project involves removing two barriers downstream from this salmon river.
The Neez is the first tributary of the Gave de Pau river encountered by the Gave de Pau salmon during their migration to spawning grounds. The project team has identified a major problem with the accessibility of this river for migratory fish, particularly Atlantic salmon.
This project will free up 8 km of river upstream on the Neez River by removing two dams: Bernet Dam and Oudoul Dam. This project is being carried out in an urban setting, which presents complex technical and social challenges. It goes beyond simply facilitating the upstream migration of fish; it prompts reflection on the relationship between residents and the river.
| Project status | Live |
|---|---|
| Project type | Dam removal: demolition |
| Country | France |
| River | Neez |
| Removal timeline | August - September 2026 |
| Km to be opened | 8 km |
| Focal species | Atlantic salmon, European eel, brown trout |
| Organisation | Fédération de Pêche 64 |
| Website | federation-peche64.fr |
In recent years, for several years in a row, juvenile salmon have been observed in the lower reaches of this river. Currently, only a 1.7 km stretch downstream is accessible to migratory fish. Two disused dams (Oudoul and Bernet Dams), located very close to each other, completely block the colonisation of the upstream section until the next obstacle, 8 km upstream (a partially passable obstacle; for salmon, the next real obstacle is 9 km upstream).
The upstream section of these two dams presents significantly greater potential than the currently colonised downstream section, in terms of available habitat area for large migratory salmonids (both for adult reproduction and juvenile rearing). This point has been specifically studied by the MIGRADOUR association: currently, only 10% of this river’s potential is accessible.
Furthermore, the river’s hydromorphology is severely disrupted by these two obstacles (liquid and solid sedimentation), resulting in reduced current velocity and siltation of the riverbed.
The project team has high hopes for this project to: